Our 3 week project complete, showing a brief snippet of the works which have taken place.
A failing 2018 installed GRP inverted warm roof was causing serious internal damage due to leaks coming into our clients kitchen / diner.
Here we stripped the roof right back to joist level and started from scratch allowing us to do things our way, although it was a 47m2 there was scary amount of work involved to getting the roof to where it is now.
We installed a Sarnafil PVC single ply membrane, with all new @eurocellplc Composite Decking. Aswell as PVC cladding to the underside of the overhang and renewing the external coving.
The glass balustrade was expertly removed and reinstalled by Simon @uniqueglass1.
A great job by the team, for great clients.